CM 1011 midterm-LSU, CM 1011 Midterm - LSU

Ace your homework & exams now with Quizwiz!

What does being "green" mean?

A green building is one that seeks to reduce or eliminate negative impacts on the natural and human environment

Brian Schneider

Bayou Lacombe Construction Company

Michael Casteneau

D.R. Horton

50 is the average number of employees per construction company in the US

False

Commercial Construction is less sophisticated than residential construction

False

D.R. Horton mostly builds custom houses in the million dollar range.

False - Around 250k

BIM stands for Business Industry Manufacturing

False - Business Info Management

CSI stands for Conditional Specification Ideas

False - Construction Specifications Institute

The code of Hammurabi dates back to the time of Julius Caesar

False - Old Babylonian Period (1754 BC)

The Purdue OWL stands for "Online Writing Language"

False - Online Writing Lab

A section view is a view outside looking at an outside wall

False - Section view is inside

One long writing session works better than lots of short sessions

False - Write then take breaks

Bullet points are for the audience, not the presenter

False - for the presenter not the audience

Natural ventilation is an area of focus when considering green outdoor quality

False - green systems don't focus on natural ventilation

In the traditional project delivery method the contractor is involved in the design

False - he isnt involved in the deisgn

The punch list corrections must be completed in order to reach the substantial completion

False - it does not have to be

A construction estimate includes contractor profit

False - it doesnt

Integrated project delivery uses a single entity for design and construction

False - it doesnt

Project close-out is determined during the design phase of a project

False - it is determined before

Site layout is determined after the construction has started

False - it is determined before

Time is relatively unimportant on a construction project

False - it is important

A pre-construction meeting is not necessary once the contract is signed

False - it is necessary

Black text on a white background is very seldom correct

False - it is usually correct

Green construction is one that seeks the least expensive way to build something

False - it seeks responsible and resource efficient ways

The order of the presentation should be the same as when the material was found

False - it shouldn't be the same

An estimator must be pratical, but not creatvie

False - must be both pratical and creative

The proper order for composing a paper or presentation is drafting, pre-writing, and polishing

False - the order is different

Superintendent is a field position under a field engineer

False - the superintendent isnt under a field engineer

Quality standards on a construction project are established by the contractor

False - they are established by the construction manager

The cover sheet on a set of drawings contain no useful information

False - they contain useful information

Architectural drawings make up the smallest part of a set of drawings

False - they make up a big part

The project manager spend all of his or her time in the office

False - they spend time in the field of work as well

Green contractors will not need to learn new techniques or materials to be "green"

False - they will need to learn new methods and techniques

Value engineering occurs only during the planning phase of a project

False - value engineers occurs during the whole project

Marc Bourgeois

President of Brown Eagle construction

What are the areas of focus in "Green Construction"

Systems Site Indoor quality Economic and social impact costs

3/6 factors to be controlled on a construction project are cost, time, and quality

True

A construction estimate is an educated guess

True

A/E is short for architect/engineer

True

Access to public transportation is an area of focus when considering green sites

True

An Estimate is an educated guess

True

Animate for effect only

True

Bayou Lacombe Construction is a C corporation for Tax purposes

True

Being "green" is more than just having solar panels on the roof

True

Civil drawings have to do with the site

True

D.R. Horton built 41,000 houses in 2016.

True

D.R. Horton has a mortgage division

True

D.R. Horton's reputations was built off of word of mouth

True

During the stone age, construction materials included mud, wood, and stone

True

Early forms of concrete were invented by the romans

True

Final documentation includes as-built drawings

True

Heavy/civil construction is also known as horizontal construction

True

Housing starts are one of the major economic indicators

True

Increasing scarcity of water is a reason to consider green construction

True

Interns at D.R. Horton first meet altogether in Fort Worth at the home office.

True

Life cycle costs are an area of focus when considering green impacts

True

Mechanical drawings include plumbing and HVAC

True

Most definitions have the pre construction phaser starting with the award of the project

True

Office engineer is an entry level position for a CM graduate

True

Plan views are as would appear from overhead looking down

True

Procurement includes getting subcontracts signed

True

Purchasing of the materials is part of the procurement

True

Silent Spring had the unintended consequence of millions of deaths in Africa

True

Solar orientation is an area of focus when considering green systems

True

Supplemental conditions amend and add to the general conditions

True

The 3 corners of the rhetorical triangle are audience, credibility, and message

True

The creation of steel facilitated the construction of sky scrapers

True

The design/build delivery method allows for fast tracking

True

The plan drawings contain the quantity of the work

True

The project delivery method is determined by the owner

True

Use of recycled and reusable materials is an area of focus for green systems

True

Your eyes are magical

True

Omer Hebert

Turner Industries

A new construction company shoulds always be an LLC

false

A site layout plan does not plan address employee parking

false

All the subcontractors bids were in conformance with the specifications

false

Bayou Lacombe Construction mainly builds houses

false

D.R. Horton mostly builds custom houses in the million dollar range.

false

Documentation should include opinions of the person preparing it

false

Quantity takeoff is the first thing an estimator should do when recieving the contracts documents

false

Site location does not impact cost

false

The class chose a profit of eight percent.

false

The minimun amount of profit and overhead to add to an estimate is 10%

false

There were seven subconstractors bidding on the overhead doors

false

Turner serves government clients in many ways

false

You don't need to have money to start your own construction company

false

the LSU group was awarded the project as the low bidder

false

the critical path is the network path with the most floats

false

the network logic stage comes before the sequence stage when producing a schedule

false

Most industrial contractors sub around 90% of the work

false - 0%

DR Horton started in 1948

false - 1978

Industrial estimating is done the same way as residential estimating

false - IE - work to develop bids or help companies control costs by reviewing the budgets of projects RE - building a relationship with the customer and developing a collaborative solution

Pricing of materials, labor, and equipment comes before quantifying such items

false - after

Scheduling addresses "how much" and "what."

false - arrange or plan (an event) to take place at a particular time.

a bid is the same as an estimate

false - bid- offer (a certain price) for something, especially at an auction. estimate- roughly calculate or judge the value, number, quantity, or extent of.

Conceptual estiamtes must be very accurate

false - conceptual estimates happen before a specific approach is decided for the project.Conceptual estimating is part art and part science. The estimator has to have a "big picture" view, looking for long-range solutions rather than shortsighted

The quality of the materials is determined by the contractor

false - designer or project owner

the network CPM is ideal for showing the owner the status of the project

false - is a step-by-step project management technique for process planning that defines critical and non-critical tasks

It is best to calculate prodctivity from the RS means book

false - progress

Superintendent responsibilies include personally processing pay applications

false - the superintendent's job is to run the day-to-day operations on the construction site and control the short-term schedule.

Michael Casteneau

residential construction

A clean site equals a safe site

true

A quanitity takeoff is used to develop direct man-hours

true

Activity on Node (AON) is the most common network diagram used in construction

true

An estimator must be detail oriented

true

An estimator should have classroom learning, plus experience, plus organizational skills

true

Bayou LAcombe Construction is a mechanical General contractor

true

Construction impact issues many include dust control

true

Delivieries and inspection of materials are superintendent responsibilities

true

Durations have to do how long an activity will take

true

Estimating is the most important part of construction if you are to make a profit

true

Marc called the summary sheet a "top sheet"

true

Meetings with subconstractors should be at least weekly

true

Michael Casteneau graduated from LSU

true

Mini-schedules are used for more detail on an item of work

true

Procurement activites are associated with obtaining with materails and equipment

true

Superintedent responsibilities include subcontractor coordination

true

The chicken coop was so big it required an overhead crane

true

The competing bidders were Bama, Ole Miss, and Auburn.

true

The larger a priject is, the more it will cost

true

The primary tool for planning is the schedule

true

Turner Industries works in the industrial construction industry

true

Turner relies more on "direct hire craftsmen" then subcontractors

true

Turner uses modular construction on many contracts

true

a schedule is the adjusted man-hours from the quantity takeoff

true

a site visit is a must before estimating a project

true

the 2004 CSI Master Format is a good way to organize an estimate

true

the company must match social secruity and Medicare withholding

true

the number "6.2" refers to social secruity withholding

true

the primary problem with a bar chart is the lack of interconnectivity of the work items

true


Related study sets

History- Flapper lifestyle and Feminism

View Set

Comps: Cano, crítica Boom, PosBoom

View Set

Unit 4: Sensation & Perception AP Practice & Unit Review

View Set

Management of Patients with Oncologic or Degenerative Neurologic Disorders

View Set

Functional Anatomy- Cardinal Planes

View Set

AC Electronic Drives Study Guide

View Set

Upper extremity- Serratus anterior- Pectoralis minor

View Set

Dental Materials Ch. 11-13 worksheet

View Set