CMGT 6500 BIM Midterm

Ace your homework & exams now with Quizwiz!

What are the sub steps to pre construction and deliver a project?

1. Acquire Construction Services- hire GC, SUB etc. 2. Plan and control work and scheduling. 3. Provide resources including ordering material, equipment, supplies and mange labor. 4. Build facility.

Benefits of Record Modeling.

1. Aid in the permitting process (e.g. continuous change vs. specified code.) 2. Ability for embedding future data based upon renovation or equipment replacement. 3. Minimize facility turnover dispute (e.g. link to contract with historical data highlights expectations and comparisons drawn to final product.)

Benefits of 4D Modeling and Phase Planning.

1. Better understanding of phases, project milestones and construction plans. 2. Dynamic phasing plans of occupancy offering multiple options and solution's to space conflicts. 3. Integrate planning of human, equipment and material resources with the BIM model to better schedule and cost estimate the project. 4. Space and workspace conflicts are identified and resolved ahead of the construction process. Software: Navisworks, Synchro, MS Project.

Benefits of Clash Detection and 3D coordination

1. Coordinate building project through a model. 2. Reduce and eliminate field conflicts; which reduces RFI's significantly to other methods. 3. Visualize construction. 4. Increase productivity.

Benefits of 3D Control and Planning

1. Decrease layout errors by linking model with real world coordinates. 2. Increasing efficiently and decreasing time spent survey in the field. 3. Reduce reworks because control points are received directly from the model.

Benefits of Site Utilization Planning.

1. Efficiently generate site usage layout for temporary facilities, assembly areas and material deliveries for all phases of construction. 2. Quickly identify potential and critical space and time conflicts. 3. Accurately evaluate site layout for safety concerns. Examples of existing software: Synchro, Navisworks, and 3D Studiomaps.

Benefits Existing Condition Modeling.

1. Enhances the efficiency and accuracy of existing conditions documentation. 2. Provides documentation of environment for future uses. 3. Aids in future modeling and 3D design coordination/clash detection. Software: laser scanning, 3D modeling)

Benefits of Digital Fabrication.

1. Ensure quality of information. 2. Minimize tolerances through machine. fabrication. 3. Increase fabrication productivity and safety. 4. Reduce lead time.

Benefits of Construction System Design.

1. Increase constructability of complex building systems. 2. Increase construction productivity. 3. Increase safety awareness.

What are the 4 steps to deliver a facility?

1. Planning the Facility 2. Designing Facility 3. Construct Facility 4. Operating Facility

Benefits of Field Management and Tracking.

1. Prevent jobsite hazards and at-risk behaviors, and ensure jobsite safety. 2. Optimize system and component performance to owner's project requirements. 3. Document as-installed information for the record and for handover, at the point-of-construction.

What are the 4 meetings that you must have?

1.Project kickoff meeting 2. design meetings 3. pre-construction meetings 4. operation meetings.

Building Information Modeling

A collaborative process which covers business drivers, automated process capabilities, and open information standards.

Building Information Management

A facility life-cycle management tool of well understood information exchanges, workflows, and procedures

Define Design Build.

A method of project delivery in which one entity works under a single contract with the project owner to provide design and construction services

Define Construction System Design.

A process in which 3D System Design Software is used to design and analyze the construction of a complex building systems (form work, glazing, tie-backs, etc.) in order to increase planning.

Define Site Utilization Planning.

A process in which BIM is used to graphically represent permanent and temporary facilities on site during multiple phases of the construction process. It can be linked to the construction schedule to convey space and sequencing requirements.

Define 4D Modeling and Phase Planning.

A process in which a 3D Modeling with added dimension of time is utilized to effectively plan the phased occupancy in a renovation, retrofit, addition or to show construction sequences and space requirements on a building site.

Define Existing Condition Modeling.

A process in which a project team develops a 3D model of the existing condition for a site, facilities on a site , or a specific area within a facility. this model can be developed in multiple ways laser scanner or conventional surveying techniques, depending on what is desired and what is most efficient.

Define Field Management and Tracking.

A process in which software is used during the construction, commissioning, and handover process to manage, track, task, and report on quality (QA/QC), safety, documents to the field, commissioning (Cx), and handover programs, connected to Building Information Models (BIM). .

Define Clash Detection and 3D Coordination.

A process in which software is used to determine field conflicts with major systems prior to installation by comparing 3D models of building systems.

Define Digital Fabrication.

A process that uses digitized information to facilitate the fabrication of construction materials or assemblies. Some uses can be seen in sheet metal, structural steel fabrication, pipe cutting, prototyping for design intent reviews.

Define 3D Control and Planning.

A process that utilizes an information model to layout facility assemblies or automate control of equipment movements and location. the information model is used to create control points aid in assembly layout. (GIS Layout site)

Building Information Model

A product or intelligent digital representation of data about a capital facility.

Define Integrated Project Delivery.

A project delivery approach that integrates people, systems, business structures and practices into a process that collaboratively harnesses the talents and insights of all participants to optimize project results, increase value to the owner, reduce waste, and maximize efficiency through allphases of design, fabrication, and construction.

What is the purpose for implementing BIM?

BEGIN WITH THE END IN MIND When planning for the implementation of BIM it is critical to consider the entire life of the facility. The planning team should strive to understand how all facility stakeholders will be implementing BIM.

Benefits of BIM on projects.

By performing organizational level planning, the team can *reduce the amount of time spent on each step of the planning process* and *maintain a manageable planning scope by defining their standard goals, uses, processes, and information exchanges*.

BIM Uses applicable to step 3 of the Construction Phase.

Constructing the facility involves 1. Site Utilization 2. 3D Coordination 3. Construction System Design 4. Digital Fabrication 5. 3D Control and Planning 6. Field Management and Tracking 7.Record Modeling

Steps 4 (of 4) for BIM Project Execution Planning Procedure

Define supporting infrastructure for BIM implementation

Steps 2 (of 4) for BIM Project Execution Planning Procedure

Design BIM project execution process

What is step two to delivering a facility?

Designing the facility involves design review and design authoring and energy analysis.

How do we Design BIM project execution process?

Develop a process which includes task supported by BIM along with information exchanges.

Steps 3 (of 4) for BIM Project Execution Planning Procedure

Develop information exchanges

Develop information exchanges requires?

Develop the information content, level of detail, and responsible party for each exchange.

What is step four to delivering a facility?

Final step to delivering a facility involves maintenance scheduling and building systems analysis. (operating facility)

Steps 1 (of 4) for BIM Project Execution Planning Procedure

Identify BIM goals and uses

Supporting infrastructure for BIM implementation requires?

Identify and determine the Delivery Strategy/Contract, Communication Procedures, Technology Infrastructure Needs, and Model Quality Control Procedure.

What are the delivery methods that are best suited for BIM?

Integrated Project Delivery (IPD) and Design Build are highly collaborative delivery methods.

What is step one to delivering a facility?

Planning the facility - Existing Conditions Modeling, Cost Estimation, Phase Planning and Site Analysis

Forces of Change

Sustainability = Integrated Delivery + Building Information Modeling

What is the purpose of the BIM Project Ex Plan?

The BIM Project Execution Plan defines uses for BIM on the project and provides a detailed design of the process for executing BIM throughout the project life-cycle.

What is interoperability?

The ability to communicate between people—and between varying types of software.

What is fragmentation?

The information delivery process generates information in a siloed manner starting from the Owner all the to the Facilities Manager. Each discipline generates it's own information sets and exchanges data independently with other project participants.

Define Record Modeling.

The process used to depict an accurate representation of the physical conditions, environment, and assets of a facility. The model should, at a minimum, contain information relating to the main architectural, structural, and MEP elements. It is the culmination of all the BIM Modeling throughout the project, including linking Operation, Maintenance, and Asset data to the As-Built model (created from the Design, Construction, 4D Coordination Models, and Subcontractor Fabrication Models) to the owner or facility manager.

Who should be involved in the development of the BIM Ex plan.

The team leading the planning process should include members from all the organizations with a significant role in the project.

What are the force of change?

These forces of change are the need to minimize energy consumption to combat climate change and deliver sustainable buildings in an efficient way which is affects the organizational and delivery structures of project management.

What is the three-legged stool of BIM?

Tools, Processes and Behaviors


Related study sets

A.R. A respectable woman Study Outline

View Set

Chapter 29: Management of Patients With Complications from Heart Disease

View Set

Finance chapter 6 conceptual questions

View Set

Care of Patients with Musculoskeletal Trauma

View Set

Certify Teacher - Social Studies

View Set

BLAW 3175 exam 1 - ch. 1 sources of law

View Set

Testout Chapter 4 (4.1-4.3 & some 4.4)

View Set

Social Psychology - Chapter 5, 6, 7 and 8

View Set

ACCT MIS 3200: CH6 Questions for Review of Key Topics

View Set