ERP Study Guide

Ace your homework & exams now with Quizwiz!

design process

A systematic problem-solving strategy that designers follow to come up with a solution to a problem.

Full sales support, Forecasting integration, Order generation, Order entry, Quoting and promising deliveries, Demand management , Logistics and distribution, and Field service

Areas of customer-focused information that are integrated with the rest of a TEI (Total Enterprise Integration) system include:

TEI systems

Can provide a competitive edge by reducing lead times and waste throughout the supply chain in addition to empowers individuals at all levels to improve their decision making.

Manufacturing execution system (MES)

Consists of required hardware and control resources related to the design, manufacture, and assembling activities.

Concurrent Engineering or sequential development

Brings people concerned with manufacturing into the design phase earlier than in the over-engineering the-wall approach

TEI systems

Either incorporate or interface with a variety of forecasting packages.

MRP II

Evolved into ERP (Enterprise Resources Planning) in the 1990s, integrating many more functions. TEI is the final evolution stage.

Current SCM literature

Fails to present or address models and/or frameworks for the key dimensions of supply chain design

VOC information

Forms the basis for designing the TEI system integration with each customer. The basic input into Quality Function Deployment.

accept customer data electronically, track inventory levels at customer locations, and create Ecommerce, Manually Entered, or Kanban customer orders automatically

In order to integrate VMI into the TEI system, the system must be able to

Intrinsic data

Internal to the company, such as shipments of finished goods, number of service contracts signed, or MTBF on replaceable components. Normally resides in a TEI system.

MRP II systems

Link the organization's planning processes with its financial system to produce "what if" scenarios to help achieve sales and profitability projections.

A fully integrated TEI system

Needs to permit a field salesperson with a laptop to have full access to all functionality no matter where he or she happens to be.

Manufacturing Execution Systems (MES)

Performance monitoring information systems for factory floor operations

BPR (Business Process Reengineering)

Redesigning workflow within and between enterprises with a cross-functional focus to improve cost, quality, service and speed. Big step changes.

Product Data Management (PDM)

Software linking style information inside a company, and external contacts. Tracks design specs and revisions for the life of the product.

The five key dimensions of Designing and implementing supply chains

Strategy, Infrastructure, Process, Organization, and Technology are

MRP

Superseded in the 1970s by MRP II (Manufacturing Resources Planning), which integrated material planning, accounting, purchasing (of materials for production), and the shop floor.

TEI systems

The communications foundation for an entire manufacturing enterprise, linking all functions internally and linking to customers and suppliers externally.

Total Enterprise Integration (TEI)

The fourth generation of MRP. ERP evolved into this.

the strategic advantage, integration, and the communication it provides. The final evolutionary step.

The power of TEI is in

Total Enterprise Integration (TEI)

The process of integrating all information and actions required to fully support a manufacturing company and its supply chain. Incorporates the people, as well as the technology.

MRP II systems

Were extremely weak in supporting salespeople in the field. However, virtually all of these capabilities are also required by inside salespeople.

Strategy, Infrastructure, Process, Organization, Technology

What are the five key dimensions of supply chain management?


Related study sets

Microeconomics 1041 James Mizzou- Final

View Set

Human Anatomy & Physiology I: Exam IV

View Set

Chapter 13 - Small Business Accounting: Projecting and Evaluating Performance

View Set