Basic DC WMSL
Peri Jet
requires a 2 1/2 in and a 4 in discharge hose (2 for 1 ratio)
S-Type Jet
1 1/2 in supply, 2 1/2 in discharge
CO2
15 lbs 40-45 seconds 4-6 feet pull pin hold insulated handle GROUND IT
How many CO2 canisters can be used in one space
2
Fireproof bulkheads
28, 52, 76
Metal Shoring strength
3-5 ft 12,000 lbs 6-11 ft 6,000 lbs (20,000 fully compressed)
CFM for a box fan
3200
Which Counter Measure Washdown Zone zone has AFFF
4
SCBA PSI
40 (4000)
Watertight bulkheads
9, 10, 16, 22, 28, 36, 44, 52, 64, 70, 76, 82, 88
FMMR
GT, main drainage (starboard side), Gen 2, Fire pump 3
Zones covered by AFFF
AMR AMMR FMMR Gen 3 (soft hose) JP 5 Incinerator Hangers Flight Deck Fantail
Watermist
AMR FMMR AMMR Gen 3
Wood Shoring
Anchor windlass DC annex
APC
Aqueous Potassium Carbonate - griddle and deep fryer, 360 fusible link
Decontamination Process
Boot wash (Calcium hypochlorite) Outer layer cutter Inner layer cutter Shower washdown (salt water) Inspection
Fire Pumps
Bow Thruster Room AMR FMMR AMMR Pump 2
Mag Sprinks
CIWS, 57 mag, small arms locker
Repair 8
CSMC
CPS
Collective Protection System
ESP
Electronic Submersible Pump 440 volt can be daisy chained
EEBD
Emergency Escape Breathing Device
shoring kit
Firmer chisel crosscut saw c-clamps ripping hammer hatchet pencil 5 lb maul folding ruler tape measure carpenter square shoring batten wedges shoring
What does CO2 cover
GT (FMMR)
JSLIST
Joint Service Lightweight Integrated Suit Technology
AMMR
Main Diesel Engines, clutches, Fire pump 4
MOPP
Mission Oriented Protective Posture
Fire Tetrahedron
Oxygen, Heat, Fuel, Chemical Chain Reaction
FM 200
Paint locker Hazmat Flammable Liquids
Repair Locker Positions
Repair Locker Leader Attack Team Leader On Scene Leader Investigator Hoseman Plugman Nozzelman Boundaryman Gas Free Engineer Repair Party Electrician Phone Talker Plotter As Dir
Ways to communicate in repair locker
SPP, Radio, Pumpkin Line, Message Blank
AFFF
Used for Bravo 11 lbs 55 seconds
AMR
VCHT (sewage), Gen 1, Fire pump 2
Hot work
anything over 400 degrees, welding + grinding
Eductors
located in watermist 1 and 2, b-hole
Carpenter Square rise and run
long end is rise
plugging kit
plugs wedges rubber sheet rags oakum hammer bucket patch plate patch box patch
When can you secure from reflashing / shoring
relfashing: 30 minutes and cool to the touch shoring: in port
patching kit
rubber sheeting, marlin ball, rags, hatchet, taylor sheers, hammer, 5lb maul