Basic DC WMSL

Pataasin ang iyong marka sa homework at exams ngayon gamit ang Quizwiz!

Peri Jet

requires a 2 1/2 in and a 4 in discharge hose (2 for 1 ratio)

S-Type Jet

1 1/2 in supply, 2 1/2 in discharge

CO2

15 lbs 40-45 seconds 4-6 feet pull pin hold insulated handle GROUND IT

How many CO2 canisters can be used in one space

2

Fireproof bulkheads

28, 52, 76

Metal Shoring strength

3-5 ft 12,000 lbs 6-11 ft 6,000 lbs (20,000 fully compressed)

CFM for a box fan

3200

Which Counter Measure Washdown Zone zone has AFFF

4

SCBA PSI

40 (4000)

Watertight bulkheads

9, 10, 16, 22, 28, 36, 44, 52, 64, 70, 76, 82, 88

FMMR

GT, main drainage (starboard side), Gen 2, Fire pump 3

Zones covered by AFFF

AMR AMMR FMMR Gen 3 (soft hose) JP 5 Incinerator Hangers Flight Deck Fantail

Watermist

AMR FMMR AMMR Gen 3

Wood Shoring

Anchor windlass DC annex

APC

Aqueous Potassium Carbonate - griddle and deep fryer, 360 fusible link

Decontamination Process

Boot wash (Calcium hypochlorite) Outer layer cutter Inner layer cutter Shower washdown (salt water) Inspection

Fire Pumps

Bow Thruster Room AMR FMMR AMMR Pump 2

Mag Sprinks

CIWS, 57 mag, small arms locker

Repair 8

CSMC

CPS

Collective Protection System

ESP

Electronic Submersible Pump 440 volt can be daisy chained

EEBD

Emergency Escape Breathing Device

shoring kit

Firmer chisel crosscut saw c-clamps ripping hammer hatchet pencil 5 lb maul folding ruler tape measure carpenter square shoring batten wedges shoring

What does CO2 cover

GT (FMMR)

JSLIST

Joint Service Lightweight Integrated Suit Technology

AMMR

Main Diesel Engines, clutches, Fire pump 4

MOPP

Mission Oriented Protective Posture

Fire Tetrahedron

Oxygen, Heat, Fuel, Chemical Chain Reaction

FM 200

Paint locker Hazmat Flammable Liquids

Repair Locker Positions

Repair Locker Leader Attack Team Leader On Scene Leader Investigator Hoseman Plugman Nozzelman Boundaryman Gas Free Engineer Repair Party Electrician Phone Talker Plotter As Dir

Ways to communicate in repair locker

SPP, Radio, Pumpkin Line, Message Blank

AFFF

Used for Bravo 11 lbs 55 seconds

AMR

VCHT (sewage), Gen 1, Fire pump 2

Hot work

anything over 400 degrees, welding + grinding

Eductors

located in watermist 1 and 2, b-hole

Carpenter Square rise and run

long end is rise

plugging kit

plugs wedges rubber sheet rags oakum hammer bucket patch plate patch box patch

When can you secure from reflashing / shoring

relfashing: 30 minutes and cool to the touch shoring: in port

patching kit

rubber sheeting, marlin ball, rags, hatchet, taylor sheers, hammer, 5lb maul


Kaugnay na mga set ng pag-aaral

Treasurey Manament - Final Quiz Compilation

View Set

Chapter 14 - Section 1 questions

View Set

EDE 4123 Content Chapter Test 2 - Senior Math Methods

View Set

Grammar Quiz: Estructura 4.2 - Miniprueba A

View Set

VMPM 378 - TEDA/EEDA - Exam 02 (study this one!!)

View Set

The Hematologic System ATI Pharmacology 4.0

View Set

Anthem Foundation/Basics Asses 2021

View Set

Chapter 4- Other Useful English Words - Part 1

View Set