CM1011 midterm study guide

¡Supera tus tareas y exámenes ahora con Quizwiz!

"Draw first, and talk second" is a good pre-design constructability conversation.

False

"Ethics only has to do with my religious beliefs."

False

A personal code of ethics starts once a child has left his or her parents.

False

A pre-construction meeting is between the contractor and the subcontractors only.

False

A project manual has two primary sections: the drawings and the specifications.

False

A site visit during the bid period is not necessary.

False

Copyright can be better classified as an ethical issue.

False

D.R. Horton builds homes in all 48 continental states.

False

D.R. Horton does not have a mortgage department.

False

In agency CM, the construction manager is at risk.

False

Palmisano does not use a Job Box.

False

Palmisano has completed over 1,000 projects.

False

Palmisano self-performs steel erection at this time.

False

Palmisano was founded in 1983.

False

Safety is not one of the six dials of project value.

False

The contractor is involved with the project from the beginning of the design phase in the design-bid-build delivery method.

False

The estimating function is one of the lesser important functions in the bid process.

False

There are two types of integrity: nationwide and local.

False

A construction company needs to have a formal ethical program in place that is enforced.

True

A contractor's bid amount is the owner's cost to do a project.

True

Asphalt, gravel, concrete, steel, and dirt make up the primary materials used in heavy civil construction.

True

Avoid wordiness.

True

Computer applications for the construction industry includes programs for estimating, scheduling, and cost control.

True

Conceptual estimating through the design process can ensure that the completed design is in line with the owner's budget.

True

Leadership is the ability to influence and persuade.

True

Marketing efforts is focused on convincing owners that they should bring the CM team on board early.

True

One of the characteristics common among estimators is organizational skills.

True

One of the constructor's jobs is to determine and implement the best construction practices, means, and methods to satisfy the owner's requirements for time, cost, and quality.

True

One of the major responsibilities of the design team is to make sure that the design meets all building codes.

True

One of the perspectives when it comes to measuring the success of a project is whether the contractor made a fair profit.

True

One of the things the owner is accountable for is creating the overall budget for the project.

True

Palmisano self-performs concrete at this time.

True

Palmisano uses BIM.

True

Palmisano uses Primavera P-6 for scheduling.

True

Palmisano uses Procore for project management.

True

Pre-construction services include feasibility studies.

True

Pre-construction services include value engineering.

True

Respondents to the survey cited over-billing as common in the construction industry.

True

Superintendents plan the execution of the project including all subcontractors & craft workforce.

True

Superintendents provide safety leadership.

True

Supplemental conditions are project specific.

True

Teamwork and trust are really the keys to successful project delivery.

True

The ability to make requests that result in actions is at the heart of effective communication.

True

The design-build delivery method better manages risks, generates greater value, and eliminates waste.

True

The final step in the construction process is the project close-out.

True

The first step in the process of getting work is to determine who is preparing to build new projects and when they will be ready to start.

True

The three basic building materials associated with commercial building are steel, concrete, and glass.

True

To earn the LSU Distinguished Communicator Award a student must take at least four communications intensive courses.

True

D.R. Horton was founded in 1948.

False

It is relatively unimportant for a contractor to find opportunities to submit proposals and negotiate to win projects.

False

The CM-at risk delivery method does not manage risk, generate value, or eliminate waste.

False

The CSI Master Format specifications group is divided into 16 subgroups.

False

The specifications basically define the quantity of the work: the length, the width, the area, the volume, and so on.

False

When presenting, it is okay to stand in the presentation field if you are pointing out something on the screen.

False

Write the abstract first.

False

An estimate is an educated guess.

True

Animation should only be used for effect.

True

Planning is about organizing the activities that have to take place in a logical sequence.

True

Pre-construction services include constructability analysis.

True

Quantifying the materials, labor, and project overhead needed is called a quantity takeoff.

True

Value engineering is a process to optimize resources to achieve the greatest value for the money being spent.

True

A constructability review during the pre-construction phase is only about the construction and economics of the project.

False

Because of competition, when selecting subcontractors, price is the only factor to consider.

False

Controlling project performance has two key components: quality and safety.

False

Electrical drawings only shows the electrical receptacles and switches.

False

Estimators are not risk takers.

False

Height of the facility does not impact the cost of construction.

False

Less than 50% of students change majors.

False

Lump-sum contracts are the least common type of contract.

False

Very few contractors subscribe to some type of electronic construction news service.

False

The best-value selection is usually based on weighted criteria.

True

The value of a project to the owner is the benefit received by the owner compared to the owner's cost of the project.

True

A CM is expected to be an expert in all facets of the construction.

False

A certificate of occupancy is produced by the contractor signifying that all life safety code requirements have been met.

False

Funding for commercial construction is almost all public.

False

When low price drives an entire project delivery process, there is much room for real value generation or innovative solution finding.

False

"Lean" has to do with the elimination of waste.

True

Field and office engineer positions are entry-level.

True

Progress and construction go hand-in-hand.

True

CAD stands for calculated assisted drawings.

False

Commercial construction tends to be far less technically complex than residential construction.

False

Time of the year does not impact costs.

False

Feelings frequently deviate from what is ethical.

True

The corporate culture of a company is usually set by management.

True

The decision to bid may be tempered by who the architect is.

True

The key to good project planning is the ability to anticipate potential problems before they become actual problems.

True

There is a very high value put on training of construction workers.

True

Programming is about the contractor clarifying the needs, goals, and objectives for the facility.

False

Project managers do not provide safety leadership.

False

Robert Horton was the founder of D.R. Horton.

False

Superintendents work mainly in the home office.

False

The best source of productivity information is R.S. Means.

False

The construction management functions are typically performed by separate construction managers.

False

The owner's name and address is not something to include in an advertisement of a project.

False

The schematic design is the end-result in the design stage.

False

A manufacturing plant is an example of an industrial construction project.

True

Constructability is the predominant reason that owners have opted to use the design-build delivery method.

True

Don't be defensive in the Q & A.

True

Each construction site is a unique environment.

True

Ethics may include the virtues of loyalty, honesty, and responsibility.

True

Every project is a one-of-a-kind facility.

True

Everyone in a group should review every part of a report.

True

It is important that all subcontractors receive the same information needed to prepare a subcontract bid.

True

Location impacts the availability and cost of labor.

True

Mobilization is about setting up and getting ready to start construction.

True

The procurement stage is often referred to as "buying out" the job.

True

Time is monitored by a detailed schedule.

True

Unethical policies can damage the image of a company and destroy employee morale.

True

"OWL" is the Online Writing Lab at LSU.

False

Accountability is unimportant is successful team building.

False

Architects deal with the systems of a building design.

False

Architectural drawings make up the smallest portion of the construction drawings.

False

Awarding the contract is always done at the bid opening.

False

BIM managers do not develop ways to enhance the client / contractor relationship on projects.

False

Construction jobsites use drones.

True

Michael Cascio is a graduate of the LSU CM department.

True

Palmisano uses technology to solve communication and documentation challenges.

True

Palmisano's communication platforms do not tie back to mobile devices.

False

Pre-construction services do not include conceptual estimates.

False

Pre-construction services include close-out reports.

False

Project managers work exclusively on the jobsite.

False

The main assertion of a slide should always be in the bottom left corner of the slide.

False

The majority of homes built by D.R. Horton exceed $500,000.

False

A detail drawing would be helpful for viewing connections and intersections.

True

BIM managers lead the efforts to coordinate project(s) construction on modeling software.

True

Best-value selection utilizes a request for proposals (RFP) to solicit bids.

True

Effective managers know that acknowledgment is a key to motivating their project teams.

True

Engineers are usually the lead designers on industrial construction projects.

True

Heavy civil construction is also known as vertical construction.

False

The Automated Retrieval System shown was a lion.

False

The more we are different, the easier it is to build trust.

False

Commissioning is the explaining to the owner the areas of operation throughout the new facility.

True

A constructability review should be done by the project manager and the designer.

False

A cost-plus-fee contract has very little paperwork associated with it.

False

An elevation is a vertical "cut" through the building from top to bottom.

False

An estimate does not improve with input from members of the team other than the estimator.

False

An ethical issue can be decided by doing a survey.

False

Being a contractor is a relatively safe endeavor since only about five percent go out of business during the first year.

False

Being ethical is the same as following the law.

False

Building trust can be quite quickly.

False

Bullet points are always effective as a presentation format.

False

Christopher Dupre, our presenter, graduated from the LSU CM program in 2013.

False

D.R. Horton self-performs most of its work.

False

D.R. Horton started building homes in Louisiana in 1990.

False

Due diligence is relatively unimportant with site work.

False

Estimators do not coordinate with subcontractors and vendors for pricing.

False

Ethical decisions are always black and white.

False

Ethics cannot be taught.

False

Heavy civil construction is mostly funded by private entities.

False

In a traditional design-bid-build delivery method, qualification is used to determine who wins the project.

False

It is not the project manager's function to put together the project team.

False

It is typically entry level CM's who are charged with finding projects for the construction company.

False

Management and leadership are the same things.

False

Most general contractors self-perform most if not all of the construction work.

False

Most projects have no cost overruns, time delays, or conflicts.

False

On a slide, you should always have a minimum of five lines of text.

False

Pre-construction services include giving the owner warranty information.

False

Quantity surveying represents more of the art of estimating.

False

Schedules are not used by Palmisano as communication tools.

False

Shape does not impact the price of all elements of the building.

False

Sharing why a project is important from a human perspective is unnecessary.

False

Tables are easy to read, so use them.

False

The construction industry accounts for approximately 43% of the U.S. gross domestic product.

False

The contractor establishes the parameters for the design of the project.

False

The fundamental cost goal is to maintain costs at or above budget parameters.

False

The mentor program is not one of the ways to get involved with the CIAC.

False

The notice to proceed always starts the clock running for the construction.

False

The order to follow when writing is drafting, prewriting, and polishing.

False

The survey found no discrepancy between the value people place on ethics and what they actually do in practice to support their values.

False

There is now less safety supervision over construction workers than in years past.

False

There is very little demand for construction workers.

False

Unit-price contracts are used when the work to be performed has accurately measured work ahead of time.

False

"PPP" stands for public-private partnership.

True

"There is never a right way to do the wrong thing."

True

50% of the D.R. Horton construction team are graduates of the LSU CM department.

True

A complete project team would include material and equipment vendors.

True

A feasibility study considers how successful the project will be in meeting the owner's intended purpose for the project.

True

A formal ethics program can help minimize risk, among other things.

True

A good boss is someone who cares about the team members, coaches them, listens to their ideas, and acknowledges them and their contributions.

True

A labor burden may be in the range of 35% of the direct labor cost.

True

A plan view is a horizontal "cut" through the entire building.

True

A purchase order is an agreement between a vendor and a customer to provide certain products that meet a particular specification for a specified price.

True

AIA General Conditions are standard provisions affecting all building construction projects.

True

Acceptance is "polite" society usually requires an ethics code that is also acceptable.

True

Action language gets people moving, and creates reliable accountability through language.

True

Admitting you have made a mistake can lead to enhancing trust.

True

After a conceptual estimate is made, the challenge for the designers is to design to the allocated budget.

True

Allow yourself to have a lousy first draft.

True

An estimate includes the cost of all materials. Labor, equipment, and subcontracts.

True

An estimate is a summary of the costs of the contractor for a particular project.

True

An estimator must be able to build the project mentally before pricing it.

True

At-risk CM, design-build, and IPD are collaborations where optimized solutions and value generation is the goal.

True

BIM coordination is an example of the typical pre-construction activities.

True

BIM improves collaboration and customer experiences.

True

Building trust is easier with people with whom you have history and experience.

True

Cite whenever it isn't your original work, including graphics.

True

Civil drawings include things such as grading, demolition, excavation, and site utilities.

True

Construction company employees need to be trained as to what the ethical standards are.

True

Construction management entails the planning, scheduling, evaluation, and controlling of construction activities.

True

Cost-plus-fee contracts are also known as time and materials.

True

D.R. Horton grew 40% in Louisiana in 2019.

True

D.R. Horton has a land development department.

True

D.R. Horton has been the #1 homebuilder since 2002.

True

D.R. Horton has built more than 750,000 homes.

True

D.R. Horton has hired over 400 interns since 2014.

True

D.R. Horton is publicly traded.

True

D.R. Horton rotates its interns through multiple of its departments.

True

D.R. Horton's motto is "America's Builder."

True

Design-bid-build is linear in nature.

True

Estimating entails the calculation and pricing of all materials, equipment, and man-hours needed to complete the work.

True

Estimators develop the construction budget once project is awarded.

True

Ethics are the moral standards used by people in making personal and business decisions.

True

Field superintendent is one of the three paths a CM may select at The Lemoine Company.

True

Getting construction work requires abilities such as negotiation, presentation, team-building, and communication skills.

True

Happy employees will work harder and faster, and the competition won't easily steal them.

True

Heavy civil contractors make huge investments in equipment.

True

Historic construction is one of Palmisano's core markets.

True

In most public projects, the open bid process must be used.

True

In the Integrated Project Delivery method, the construction manager will have an opportunity to contribute expertise relative to constructability.

True

It is the owner who decides which project delivery method will be used.

True

Job-specific overhead (or project overhead or general conditions) include the superintendent's pay.

True

Most construction project teams are temporary organizations.

True

Office overhead (general overhead) are costs incurred by a contractor whether or not it has projects.

True

Polishing is made up of revising and editing.

True

Pre-construction services should begin during the design phase.

True

Private projects usually use the closed bid system.

True

Project evaluation is when the CM team debriefs the project as to what worked and what didn't work.

True

Project managers are the direct liaison between the contractor and the clients and design teams.

True

Quality is monitored by the specifications, punch lists, inspections, tests, and user surveys.

True

The CSI Master Format utilizes a six-digit numbering system.

True

The construction industry in the United States employs more than 7 million people directly, and many more indirectly.

True

The contract documents are the medium through which the designer communicates the design intent to the contractor

True

The design stage is about aesthetics, function, and layout.

True

The design-bid-build delivery method has pitted the various different project players against one another.

True

The most basic CM skill necessary is the ability to read construction drawings.

True

The purchasing of construction services is often referred to as procurement.

True

The three principal players in any construction project are the owner, the designer, and the contractor.

True

The use of unique materials adds to the construction costs.

True

There are basically two types of owners: public owners and private owners.

True

Value engineering and constructability reviews are a benefit of bring CM's on board early.

True

Value engineering can only be done in the design phase if a project's value is to be maximized.

True

When presenting, you should stand straight and face the audience.

True

You get your ethics from values and principles.

True

Your eyes are magical.

True


Conjuntos de estudio relacionados

APES: Human Population Practice Questions

View Set

Personal Finance Chapter 2 - Money Management Skills

View Set