"Draw first, and talk second" is a good pre-design constructability conversation.
False
"Ethics only has to do with my religious beliefs."
False
A personal code of ethics starts once a child has left his or her parents.
False
A pre-construction meeting is between the contractor and the subcontractors only.
False
A project manual has two primary sections: the drawings and the specifications.
False
A site visit during the bid period is not necessary.
False
Copyright can be better classified as an ethical issue.
False
D.R. Horton builds homes in all 48 continental states.
False
D.R. Horton does not have a mortgage department.
False
In agency CM, the construction manager is at risk.
False
Palmisano does not use a Job Box.
False
Palmisano has completed over 1,000 projects.
False
Palmisano self-performs steel erection at this time.
False
Palmisano was founded in 1983.
False
Safety is not one of the six dials of project value.
False
The contractor is involved with the project from the beginning of the design phase in the design-bid-build delivery method.
False
The estimating function is one of the lesser important functions in the bid process.
False
There are two types of integrity: nationwide and local.
False
A construction company needs to have a formal ethical program in place that is enforced.
True
A contractor's bid amount is the owner's cost to do a project.
True
Asphalt, gravel, concrete, steel, and dirt make up the primary materials used in heavy civil construction.
True
Avoid wordiness.
True
Computer applications for the construction industry includes programs for estimating, scheduling, and cost control.
True
Conceptual estimating through the design process can ensure that the completed design is in line with the owner's budget.
True
Leadership is the ability to influence and persuade.
True
Marketing efforts is focused on convincing owners that they should bring the CM team on board early.
True
One of the characteristics common among estimators is organizational skills.
True
One of the constructor's jobs is to determine and implement the best construction practices, means, and methods to satisfy the owner's requirements for time, cost, and quality.
True
One of the major responsibilities of the design team is to make sure that the design meets all building codes.
True
One of the perspectives when it comes to measuring the success of a project is whether the contractor made a fair profit.
True
One of the things the owner is accountable for is creating the overall budget for the project.
True
Palmisano self-performs concrete at this time.
True
Palmisano uses BIM.
True
Palmisano uses Primavera P-6 for scheduling.
True
Palmisano uses Procore for project management.
True
Pre-construction services include feasibility studies.
True
Pre-construction services include value engineering.
True
Respondents to the survey cited over-billing as common in the construction industry.
True
Superintendents plan the execution of the project including all subcontractors & craft workforce.
True
Superintendents provide safety leadership.
True
Supplemental conditions are project specific.
True
Teamwork and trust are really the keys to successful project delivery.
True
The ability to make requests that result in actions is at the heart of effective communication.
True
The design-build delivery method better manages risks, generates greater value, and eliminates waste.
True
The final step in the construction process is the project close-out.
True
The first step in the process of getting work is to determine who is preparing to build new projects and when they will be ready to start.
True
The three basic building materials associated with commercial building are steel, concrete, and glass.
True
To earn the LSU Distinguished Communicator Award a student must take at least four communications intensive courses.
True
D.R. Horton was founded in 1948.
False
It is relatively unimportant for a contractor to find opportunities to submit proposals and negotiate to win projects.
False
The CM-at risk delivery method does not manage risk, generate value, or eliminate waste.
False
The CSI Master Format specifications group is divided into 16 subgroups.
False
The specifications basically define the quantity of the work: the length, the width, the area, the volume, and so on.
False
When presenting, it is okay to stand in the presentation field if you are pointing out something on the screen.
False
Write the abstract first.
False
An estimate is an educated guess.
True
Animation should only be used for effect.
True
Planning is about organizing the activities that have to take place in a logical sequence.
True
Pre-construction services include constructability analysis.
True
Quantifying the materials, labor, and project overhead needed is called a quantity takeoff.
True
Value engineering is a process to optimize resources to achieve the greatest value for the money being spent.
True
A constructability review during the pre-construction phase is only about the construction and economics of the project.
False
Because of competition, when selecting subcontractors, price is the only factor to consider.
False
Controlling project performance has two key components: quality and safety.
False
Electrical drawings only shows the electrical receptacles and switches.
False
Estimators are not risk takers.
False
Height of the facility does not impact the cost of construction.
False
Less than 50% of students change majors.
False
Lump-sum contracts are the least common type of contract.
False
Very few contractors subscribe to some type of electronic construction news service.
False
The best-value selection is usually based on weighted criteria.
True
The value of a project to the owner is the benefit received by the owner compared to the owner's cost of the project.
True
A CM is expected to be an expert in all facets of the construction.
False
A certificate of occupancy is produced by the contractor signifying that all life safety code requirements have been met.
False
Funding for commercial construction is almost all public.
False
When low price drives an entire project delivery process, there is much room for real value generation or innovative solution finding.
False
"Lean" has to do with the elimination of waste.
True
Field and office engineer positions are entry-level.
True
Progress and construction go hand-in-hand.
True
CAD stands for calculated assisted drawings.
False
Commercial construction tends to be far less technically complex than residential construction.
False
Time of the year does not impact costs.
False
Feelings frequently deviate from what is ethical.
True
The corporate culture of a company is usually set by management.
True
The decision to bid may be tempered by who the architect is.
True
The key to good project planning is the ability to anticipate potential problems before they become actual problems.
True
There is a very high value put on training of construction workers.
True
Programming is about the contractor clarifying the needs, goals, and objectives for the facility.
False
Project managers do not provide safety leadership.
False
Robert Horton was the founder of D.R. Horton.
False
Superintendents work mainly in the home office.
False
The best source of productivity information is R.S. Means.
False
The construction management functions are typically performed by separate construction managers.
False
The owner's name and address is not something to include in an advertisement of a project.
False
The schematic design is the end-result in the design stage.
False
A manufacturing plant is an example of an industrial construction project.
True
Constructability is the predominant reason that owners have opted to use the design-build delivery method.
True
Don't be defensive in the Q & A.
True
Each construction site is a unique environment.
True
Ethics may include the virtues of loyalty, honesty, and responsibility.
True
Every project is a one-of-a-kind facility.
True
Everyone in a group should review every part of a report.
True
It is important that all subcontractors receive the same information needed to prepare a subcontract bid.
True
Location impacts the availability and cost of labor.
True
Mobilization is about setting up and getting ready to start construction.
True
The procurement stage is often referred to as "buying out" the job.
True
Time is monitored by a detailed schedule.
True
Unethical policies can damage the image of a company and destroy employee morale.
True
"OWL" is the Online Writing Lab at LSU.
False
Accountability is unimportant is successful team building.
False
Architects deal with the systems of a building design.
False
Architectural drawings make up the smallest portion of the construction drawings.
False
Awarding the contract is always done at the bid opening.
False
BIM managers do not develop ways to enhance the client / contractor relationship on projects.
False
Construction jobsites use drones.
True
Michael Cascio is a graduate of the LSU CM department.
True
Palmisano uses technology to solve communication and documentation challenges.
True
Palmisano's communication platforms do not tie back to mobile devices.
False
Pre-construction services do not include conceptual estimates.
False
Pre-construction services include close-out reports.
False
Project managers work exclusively on the jobsite.
False
The main assertion of a slide should always be in the bottom left corner of the slide.
False
The majority of homes built by D.R. Horton exceed $500,000.
False
A detail drawing would be helpful for viewing connections and intersections.
True
BIM managers lead the efforts to coordinate project(s) construction on modeling software.
True
Best-value selection utilizes a request for proposals (RFP) to solicit bids.
True
Effective managers know that acknowledgment is a key to motivating their project teams.
True
Engineers are usually the lead designers on industrial construction projects.
True
Heavy civil construction is also known as vertical construction.
False
The Automated Retrieval System shown was a lion.
False
The more we are different, the easier it is to build trust.
False
Commissioning is the explaining to the owner the areas of operation throughout the new facility.
True
A constructability review should be done by the project manager and the designer.
False
A cost-plus-fee contract has very little paperwork associated with it.
False
An elevation is a vertical "cut" through the building from top to bottom.
False
An estimate does not improve with input from members of the team other than the estimator.
False
An ethical issue can be decided by doing a survey.
False
Being a contractor is a relatively safe endeavor since only about five percent go out of business during the first year.
False
Being ethical is the same as following the law.
False
Building trust can be quite quickly.
False
Bullet points are always effective as a presentation format.
False
Christopher Dupre, our presenter, graduated from the LSU CM program in 2013.
False
D.R. Horton self-performs most of its work.
False
D.R. Horton started building homes in Louisiana in 1990.
False
Due diligence is relatively unimportant with site work.
False
Estimators do not coordinate with subcontractors and vendors for pricing.
False
Ethical decisions are always black and white.
False
Ethics cannot be taught.
False
Heavy civil construction is mostly funded by private entities.
False
In a traditional design-bid-build delivery method, qualification is used to determine who wins the project.
False
It is not the project manager's function to put together the project team.
False
It is typically entry level CM's who are charged with finding projects for the construction company.
False
Management and leadership are the same things.
False
Most general contractors self-perform most if not all of the construction work.
False
Most projects have no cost overruns, time delays, or conflicts.
False
On a slide, you should always have a minimum of five lines of text.
False
Pre-construction services include giving the owner warranty information.
False
Quantity surveying represents more of the art of estimating.
False
Schedules are not used by Palmisano as communication tools.
False
Shape does not impact the price of all elements of the building.
False
Sharing why a project is important from a human perspective is unnecessary.
False
Tables are easy to read, so use them.
False
The construction industry accounts for approximately 43% of the U.S. gross domestic product.
False
The contractor establishes the parameters for the design of the project.
False
The fundamental cost goal is to maintain costs at or above budget parameters.
False
The mentor program is not one of the ways to get involved with the CIAC.
False
The notice to proceed always starts the clock running for the construction.
False
The order to follow when writing is drafting, prewriting, and polishing.
False
The survey found no discrepancy between the value people place on ethics and what they actually do in practice to support their values.
False
There is now less safety supervision over construction workers than in years past.
False
There is very little demand for construction workers.
False
Unit-price contracts are used when the work to be performed has accurately measured work ahead of time.
False
"PPP" stands for public-private partnership.
True
"There is never a right way to do the wrong thing."
True
50% of the D.R. Horton construction team are graduates of the LSU CM department.
True
A complete project team would include material and equipment vendors.
True
A feasibility study considers how successful the project will be in meeting the owner's intended purpose for the project.
True
A formal ethics program can help minimize risk, among other things.
True
A good boss is someone who cares about the team members, coaches them, listens to their ideas, and acknowledges them and their contributions.
True
A labor burden may be in the range of 35% of the direct labor cost.
True
A plan view is a horizontal "cut" through the entire building.
True
A purchase order is an agreement between a vendor and a customer to provide certain products that meet a particular specification for a specified price.
True
AIA General Conditions are standard provisions affecting all building construction projects.
True
Acceptance is "polite" society usually requires an ethics code that is also acceptable.
True
Action language gets people moving, and creates reliable accountability through language.
True
Admitting you have made a mistake can lead to enhancing trust.
True
After a conceptual estimate is made, the challenge for the designers is to design to the allocated budget.
True
Allow yourself to have a lousy first draft.
True
An estimate includes the cost of all materials. Labor, equipment, and subcontracts.
True
An estimate is a summary of the costs of the contractor for a particular project.
True
An estimator must be able to build the project mentally before pricing it.
True
At-risk CM, design-build, and IPD are collaborations where optimized solutions and value generation is the goal.
True
BIM coordination is an example of the typical pre-construction activities.
True
BIM improves collaboration and customer experiences.
True
Building trust is easier with people with whom you have history and experience.
True
Cite whenever it isn't your original work, including graphics.
True
Civil drawings include things such as grading, demolition, excavation, and site utilities.
True
Construction company employees need to be trained as to what the ethical standards are.
True
Construction management entails the planning, scheduling, evaluation, and controlling of construction activities.
True
Cost-plus-fee contracts are also known as time and materials.
True
D.R. Horton grew 40% in Louisiana in 2019.
True
D.R. Horton has a land development department.
True
D.R. Horton has been the #1 homebuilder since 2002.
True
D.R. Horton has built more than 750,000 homes.
True
D.R. Horton has hired over 400 interns since 2014.
True
D.R. Horton is publicly traded.
True
D.R. Horton rotates its interns through multiple of its departments.
True
D.R. Horton's motto is "America's Builder."
True
Design-bid-build is linear in nature.
True
Estimating entails the calculation and pricing of all materials, equipment, and man-hours needed to complete the work.
True
Estimators develop the construction budget once project is awarded.
True
Ethics are the moral standards used by people in making personal and business decisions.
True
Field superintendent is one of the three paths a CM may select at The Lemoine Company.
True
Getting construction work requires abilities such as negotiation, presentation, team-building, and communication skills.
True
Happy employees will work harder and faster, and the competition won't easily steal them.
True
Heavy civil contractors make huge investments in equipment.
True
Historic construction is one of Palmisano's core markets.
True
In most public projects, the open bid process must be used.
True
In the Integrated Project Delivery method, the construction manager will have an opportunity to contribute expertise relative to constructability.
True
It is the owner who decides which project delivery method will be used.
True
Job-specific overhead (or project overhead or general conditions) include the superintendent's pay.
True
Most construction project teams are temporary organizations.
True
Office overhead (general overhead) are costs incurred by a contractor whether or not it has projects.
True
Polishing is made up of revising and editing.
True
Pre-construction services should begin during the design phase.
True
Private projects usually use the closed bid system.
True
Project evaluation is when the CM team debriefs the project as to what worked and what didn't work.
True
Project managers are the direct liaison between the contractor and the clients and design teams.
True
Quality is monitored by the specifications, punch lists, inspections, tests, and user surveys.
True
The CSI Master Format utilizes a six-digit numbering system.
True
The construction industry in the United States employs more than 7 million people directly, and many more indirectly.
True
The contract documents are the medium through which the designer communicates the design intent to the contractor
True
The design stage is about aesthetics, function, and layout.
True
The design-bid-build delivery method has pitted the various different project players against one another.
True
The most basic CM skill necessary is the ability to read construction drawings.
True
The purchasing of construction services is often referred to as procurement.
True
The three principal players in any construction project are the owner, the designer, and the contractor.
True
The use of unique materials adds to the construction costs.
True
There are basically two types of owners: public owners and private owners.
True
Value engineering and constructability reviews are a benefit of bring CM's on board early.
True
Value engineering can only be done in the design phase if a project's value is to be maximized.
True
When presenting, you should stand straight and face the audience.
True
You get your ethics from values and principles.
True
Your eyes are magical.
True