2-3 L12
the symbols and abbreviations shown on a print are the only ones that can be used on the particular print they apply to
true
when the concrete is being poured, high frequency ____ shall be used to remove the voids
vibrators
in this title block, the scale used is ____
1" = 600'
the concrete for the poured slabs shall have a comprehensive strength of 5,000 PSI in ___ days after pouring
28
the site referred to is set with ____ GPS coordinates
5
concrete shall have reinforcing steel and shall conform to ASTM A615, Grade 60
True
the government agency that sets benchmarks showing elevation and coordinates along major highways is the ____
USGS
in the drawing of the access road, the existing grade of the land is represented by a ____ line
dashed
every engineer has a set of standard symbols that must be used on every drawing
false
the finished grade elevation for the substation site is shown on the ____
legend
this ___ map shows the substation site set in an area covering three states
location
the letters GPS stand for global ____ system
positioning
what type of conduit is run-under the slab
schedule 40 PVC
the notes attached to a print are not as detailed as a ____ sheet, which may be provided by the engineer
specification