Boor 360 ch 6

Pataasin ang iyong marka sa homework at exams ngayon gamit ang Quizwiz!

Firms that service customers from finished goods inventory are known as which of the following

make-to-stock.

The calculated theoretical number of workstations should be Blank______.

rounded up to the next highest integer.

In a project layout, a high degree of Blank______ is common.

task ordering

In a layout, machines are grouped according to type or function and parts travel to the appropriate location for processing.

Blank 1: workcenter

Which of the following products would use a project layout?

Bridge

Which layout format groups machines to work on products that have similar processing requirements?

Manufacturing cell

In an organizational context, break-even analysis is also known as Blank______.

cost-volume-profit analysis

Customer order decoupling points

determine lead times. can impact inventory investment.

A manufacturing cell is generally made up of Blank______ machines.

dissimilar

Inventory turn is calculated by

dividing cost of goods sold by average inventory value.

When parts are moved on a conveyor that passes a series of workstations in a uniform time interval, this is called the ___.

workstation cycle time

The time between successive units coming off the end of an assembly line is referred to as

workstation cycle time.

Standardization on the product-process matrix refers to

variations in the product.

Last year a firm had an average inventory of $1,500,000 and the cost of goods sold was $3,750,000. What was the days-of-supply last year?

124 Reason: Days-of-Supply = Average inventory / Cost of goods sold × 365 =$1,500,000 / $3,750,000 × 365 = 146

Last year a firm had an average inventory of $1,500,000 and the cost of goods sold was $3,750,000. What was the inventory turn last year?

2.5 Reason: Inventory turn = Cost of goods sold / Average inventory =$3,750,000 / $1,500,000 = 2.5

An assembly line must produce 1,000 units in an 8 hour day. Assuming the line operates continuously, what is the required workstation cycle time?

28.8 seconds Reason: C = Production time per day Required output per day (in units) = 8 hours / day × 60 minutes / hour × 60 seconds / minute 1,000 units = 28.8 seconds / unit

If the sum of all task times is 100 seconds and the required cycle time is 21 seconds, what is the theoretical minimum number of workstations?

5 Reason: Nt= Sum of task times / Required cycle time = 100 / 21 = 4.76 - round up to 5.

For an assembly-line system with 6 workstations, the cycle time is 27 seconds and the sum of task times is 120 seconds. What is the efficiency of this balance?

74.1% Reason: Efficiency = Sum of task / (Actual number of workstations × Cycle time) = 120/ (6 × 27) = 120/ 162 = 0.741 = 74.1%

Which of the following is NOT true about a workcenter layout?

A workcenter layout is commonly used for systems with high production volumes.

Which layout moves product from workstation to workstation at a controlled rate?

Assembly line

Which of the following type of work flow is appropriate when production volume is high? Multiple choice question.

Assembly line

Which the following describes the layout for items produced through a fixed sequence of workstations?

Assembly line

Which common layout format refers to the progressive build of a product?

Assembly line Reason: An assembly line refers to the progressive build of a product linked by some sort of material handling device.

The efficiency of an assembly-line balance must always be less than or equal to %.

Blank 1: 100, hundred, or one hundred

There are dimensions depicted on a product-process matrix.

Blank 1: 2

The long-term relationship between inventory, throughput, and flow time is mathematically related using 's law.

Blank 1: Little

A line layout can increase operator access and improve workstation time.

Blank 1: U-shaped, u shaped, or flexible

An arranges processes according to the sequence of steps by which the product is manufactured.

Blank 1: assembly Blank 2: line

A map showing the flow of materials through a manufacturing system is known as a -to- process map.

Blank 1: make Blank 2: stock

A layout uses dedicated areas for production of similar products.

Blank 1: manufacturing Blank 2: cell

Workcenters are often structured to the movement of material.

Blank 1: optimize or optimizes

The relationship identifies the restrictions imposed by product design and process technologies.

Blank 1: precedence

The - matrix shows when different production process types are used in relation to product volume and standardization.

Blank 1: product Blank 2: process

To determine the required workstation cycle time, an analyst needs to know the per day and the required per day (in units).

Blank 1: production Blank 2: time Blank 3: output

Which process layout is best used for manufacturing liquids?

Continuous Reason: Continuous process is used for manufacturing items such as liquids, chemicals, and drugs.

Days of Supply formula

Days-of-Supply = Average inventory / Cost of goods sold × 365

Which of the following is not a step required to make a good?

Decoupling

Which of the following is NOT a step in the process of developing a manufacturing cell?

Determine which machines perform the same process.

True or false: The total work at a workstation is equal to the sum of all tasks to complete a product.

False

Identify the true statements about assembly-line and continuous process layouts.

In a continuous process, a product moves continuously through the process. In an assembly line, a product goes through a progressive set of steps. Often, the item being produced in a continuous process is a liquid or chemical that actually flows through the system.

Little's law relates inventory, throughput rate, and flow time as

Inventory = Throughput rate x Flow time

Which of the following statements about inventory measures is TRUE?

Inventory turn compares cost of goods sold to average inventory. Days-of-supply measures how long (on average) a firm's inventory can support sales.

The issue of balancing the level of finished inventory against the level of service to the customer occurs in which type of firm?

Make-to-stock

Which type of firm invests in lean manufacturing programs in order to improve customer service levels for a given inventory investment?

Make-to-stock

In which production system does the product remain in one place while resources (such as workers or equipment) travel to the product when needed?

Project layout

______ techniques are typically used to manage production processes that follow a project layout structure.

Project management

Which of the following is not a step in the process to balance an assembly line?

Randomly assign tasks to workstations.

Which are characteristics of a continuous process line?

Shutdowns can be expensive. May operate 24 hours a day. Highly automated machinery is used.

Place the steps associated with the production process into order (from first to last).

Sourcing making delivering

Match each inventory measure with its definition.

Total average value of inventory-----Sum of raw material, work-in-process, and finished goods inventory Inventory turn-----Cost of goods sold/Average inventory Days-of-Supply------Average Inventory/Cost of goods sold x 365

True or false: The longest required task time often defines the shortest possible workstation cycle time for production.

True

True or false: Typically, there is a trade-off where quicker response to customer demand comes at the expense of greater inventory investment.

True

Which of the following is not a way to reduce the required time for a task?

Use a less skilled worker Reason: A more skilled worker may reduce the required time for a task.

Which work flow structure is appropriate for a process with great flexibility to produce a variety of products?

Workcenter

Firms invest in lean manufacturing programs in order to

achieve high customer service with minimum levels of inventory investment.

Workcenters with large amounts of interdepartmental traffic are often placed

adjacent to each other.

A flexible line layout may improve assembly-line balance by

allowing work sharing among employees.

In an organizational context, the main purpose of break-even analysis is to Blank______.

ascertain the quantity at which the initial investment starts to make a profit

The point in the supply chain where inventory is positioned to allow the preceding processes to operate independently is the

customer order decoupling point.

The required workstation cycle time is determined by

dividing the production time per day by the required output per day.

The time required to respond to a customer order is known as

lead time.

The practice of achieving high levels of customer service with a minimal inventory investment is known as manufacturing.

lean

Lead time can vary based on Blank______.

location of the manufacturing facility. customization of the product being produced.

When attempting to balance an assembly-line, the amount of idle time across workstations should be Blank______.

minimized

If inventory turn is known, days-of-supply is calculated by

multiplying the inverse of inventory turn by 365 days. Reason: Days-of-Supply... = Average inventory / Cost of goods sold × 365 = 1 / Inventory turn × 365

Workcenters are often focused on

one type of operation.

On an assembly-line, the order in which tasks must be performed is called the Blank______.

precedence relationship

A framework depicting when the different production process types are typically used depending on volume and standardization is known as the

product-process matrix.

Rank the production process layouts from lowest- to highest-volume (top to bottom).

project workcenter manufacturing cell assembly line

A production process map is built by

tracking the flow of material through the system.


Kaugnay na mga set ng pag-aaral

BFIN 322-800 Business Finance Chapter One Homework

View Set

Uri ng Implasyon at ang Pagsukat sa Implasyon

View Set

Exam FX Insurance , Chapter 2 : Contract Law

View Set

Unit 1 - all words (Project 1 4th edition)

View Set

APUSH Chapter 2 - European Powers in the Atlantic World (1607-1754)

View Set

Core Subjects Cert Exam - Science - Nature of Science

View Set

Marine Resources, Fisheries and the Impact of Plastic

View Set