HW # 20

Réussis tes devoirs et examens dès maintenant avec Quizwiz!

Which document establishes the forms, content and procedures for submitting the bid proposals?

Instructions to Bidders

Which document issued by the Architect illustrates what is to be built?

Plans

When there is a conflict between the plans and specifications, the plan will govern.

False

The Spearin Doctrine states that the contractor is not liable for performance when the design specifications have been followed.

True

Which document makes changes, modifications and corrections prior to bid opening?

Addendas

Which document describes the duties and responsibilities of each party and the business procedures for administering the contract?

General Conditions

Which document specifies the Regulations required such as soil erosion or minorities?

General Requirements

"The system shall develop a total output of 20,000 BTU." is considered as a performance specification.

True

"The wall shall be constructed of 2 × 4 studs spaced at 16 inches on center." is Design Specification.

True

Which document describes quality of work, the quality of the materials, and the construction execution procedures?

the technical specifications


Ensembles d'études connexes

Chapter 15: Anxiety and Obsessive-Compulsive Related Disorders

View Set

Chapter 12: Supply Chain Management in the Service Industry

View Set

Chapter 45: Nursing Care of the Child With an Alteration in Tissue Integrity/Integumentary Disorder

View Set

MIS Lab Final Review (Practice Test), MIS Lab Final Review (PS 1-12), mis lab my problem sets, MIS 111 Lab Final Questions from Problem Sets, MIS 111 Problem Sets 1-12, MIS111L Final Study Guide Fall 2015, MIS 111L past problem sets, MIS111L Practice...

View Set