OSHA 30 - Quiz - 13
Repaired wire rope is acceptable for use on suspended scaffolds
False
________ scaffolds consist of one or more platforms supported by outrigger beams, brackets, poles, legs, uprights, posts, frames or similar rigid support.
Supported
Employees performing work from a scaffold must be trained on proper use, maximum Los capacity and any electrical hazards present
True
It is important to inspect scaffolds and scaffold components for visible defects before each work shift and after any occurs FE that could affect a scaffolds integrity
True
Each platform must be fully planked and at least 18 inches wide
True
A means of access must be provided to a scaffold platform if there is no existing access within ___ feet of the platform
2
Each scaffold and it's components must be capable of supporting, without failure, it's own weight and at least ___ times the maximum intended load applied to it.
4
Which of the following are required in order to safely use fabricated frame scaffolds?
All of the above
Which of the following is not an OSHA standard for the proper use of scaffolds
Scaffolds can be loaded in excess of their maximum intended rated capacity
An interior hung suspension scaffold consists of a platform suspended from the ceiling or roof structure by fixed-length supports.
True