Which of the following is not a sub-process associated with risk management

risk measurement;

Which of the following is most closely associated with FMEA?

risk priority number

Altering the specifications of an ongoing project is referred to as?

scope creep

The main distinction between platform and breakthrough projects is that the former usually depend on existing technology

true

The process of managing the way different departments or groups work together is called integration management

true

The project baseline plan is the open honest and frequent communication between the interested parties of a project

true

The project manager must maintain a high level of flexibility in dealing with people.

true

The task of bringing the work of all groups together to make a harmonious whole is called systems engineering.

true

You can depict who is responsible for a task on a RACI.

true

Searching for the third alternative is most closely associated with?

win win negotiation

Which of the following is not an important advantage of empowerment?

high degree of worker specialization;

A functional project structure is not characterized by:

improved communications;

Which of the following is a numeric project selection method?

payback period

The three primary goals of any project are:

performance budget schedule;

Which of the following would not be considered a project?

placing the weekly replenishment order;

Entries above the diagonal in the Design Structure Matrix indicate

potential rework situations

The ________________________ attempts to link the organizations projects directly to the goals and strategy of the organization.

project portfolio process

Which of the following is not a trend in project management?

reductive projects

It is common practice to select the project manager prior to the project being selected

false

It is more important for project team members to focus on their specific project activities than on the projects overall results.

false

Negotiating the purchase of a new car would typically be characterized as win win negotiation

false

One reason for the emphasis on project management is that tasks fit neatly into business as usual.

false

Project budgets are primarily modifications of budgets for the same activity in the previous period.

false

Project team conflict stifles team creativity.

false

Projects success is not determined by the portfolio of projects in an organization.

false

Rank-ordering a large number of projects can be done with a Qsort

false

Schedules section of the project master plan.

false

Since the PM has position power there is no need for them to have credibility.

false

Taken together the RACI and the Work Breakdown Structure may be used to determine the importance of each task listed.

false

The RACI matrix is a tool to organize the cost in your project plan.

false

The construction of a house would likely follow a J shaped lifecycle

false

The details of the project work force are discussed in the Resource Requirements section of the project master plan.

false

The main distinction between platform and derivative projects is that the latter depend on existing technology.

false

The primary purpose of the launch meeting is to develop the project plan and budget

false

The project manager depends on legitimate authority to gain the cooperation of the many departments in the organization that may be asked to supply technology, information, resources and personnel to the project.

false

The project manager is supposed to facilitate the work of the project team and must therefore stay aloof from the conflicts arising among project team members.

false

The project manager should take a careful analytic approach to making decisions about projects

false

The project plan should begin with a complete description of all agreements made with the client or any third party.

false

The start and finish date of a project must be specified before the action plan can be completed.

false

When planning it is best for the project manager to breakdown and define the different levels of the project plan.

false

When using the weighted scoring model the categories for each scale must be in equal intervals.

false

While the design structure matrix can help identify potential rework situations typically nothing can be done to avoid them.

false

The project team members should be all of the following except.

focused on activities

In Crystal Ball, cells that contain outcomes we are interested in are called

forecast cells

Which of the following types of organizations would likely not have a program manager?

functional project organization;

It is acceptable to restrict the launch meeting to brainstorming a problem.

true

It is critical to a projects success to have top management support.

true

Lack of planning is a major contributor to projects failure.

true

Mind mapping is a planning tool

true

Mind mapping is a whole brain approach that is particularly applicable to project management.

true

Multidisciplinary teams are almost certain to operate in an environment of conflict

true

Project team members are often faced with conflicting orders in a matrix organization.

true

Projects are subdivisions of programs.

true

Projects in which team members may never physically meet before the team is disbanded and another team reconstituted is called a virtual team.

true

RD projects are oriented toward using newly developed technologies or existing technologies in a new manner

true

Scoring methods were developed to overcome some of the disadvantages of simple financial profitability methods.

true

The comparative benefits method is considered a nonnumeric project selection method.

true

The design structure matrix can be used to identify potential rework situations due to the flow of information in a project

true

The functional manager has expertise in the function he or she manages but the project manager rarely has expertise in many of the projects technical areas.

true

The initial project meeting is just to coordinate the project so areas of responsibility do not need to be discussed.

false

One can trade off time and cost when managing a project, but the projects technical specifications must be maintained exactly as the client initially specifies

false

If a PM manages her project well enough she can eliminate uncertainty.

'False'.

For a self directed team to be successful team members must be given their authority and mission by senior management.

'True'.

The job of managing work across multiple groups is called integration management.

false

The salary requirements of human resources are a required element in the project plan.

False'.

A or An __________________ shows the set of all tasks in a project arranged by task level?

Work Breakdown Structure

According to the text the use of sticky notes can be particularly useful for constructing a n

Work Breakdown Structure;

If the initial investment is a project is 100000 and the expected annual net profit for the project is 20000 the payback period is.

5 years;

Dysfunctions of a team include

All of the above

Which of the following is are criteria for project selection? The aggregate project plan can be used for the following except which of the following? {~View the mix of projects within each illustrated aspect; =Determine the profitability of the projects; ~Analyze and adjust the mix of projects within each category or aspect; ~Identify and adjust the gaps in the categories, aspects, sizes and timing of the projects}

All of the above

Which of the following criteria can be included in scoring models for selecting projects

All of the above can be included;

FMEA stands for.

Failure Modes and Effect Analysis;

A project that is selected because it is necessary for continued operations exemplifies a sacred cow.

False

An advantage of pure project organization is its great depth of technical knowledge.

False

Cross divisional project communication is enhanced when a project is organized in a functional project organization.

False

Defining resource needs is not necessary on small projects

False

In the early years of a project when outflows usually exceed inflows the NPV of the project for those years will be positive.

False

Intrateam conflicts are minimal in a matrix organization.

False

It is common practice to select the project manager prior to the project being selected.

False

It is not possible to overdo it when it comes to project planning.

False

Many recent developments in project management are being driven by changes in the nature of the American workforce.

False

Nonnumeric project selection methods are only suitable if numeric methods are not available.

False

One of the few similarities between project management and general management is that both exist in the well-defined organizational structure of superior/subordinates in the overall organization.

False

One of the problems with mind mapping is that it is relatively difficult to convert into work breakdown structure WBS.

False

Programs are subdivisions of projects.

False

Project war rooms discourage team cooperation, morale and communications.

False

Projects with deliverables that are incrementally different from existing offerings are classified as platform projects.

False

RACI stands for remove all cost information.

False

The project manager can plan at all levels of the project.

False

The work breakdown structure is one way to separate project activities by their level of importance.

False

When making trade offs on a project, the project manager needs to be aware that profit for the firm is always the most important of the projects goals.

False

When using financial methods for selecting projects, the payback period is the simplest and best method to use.

False

While general managers have their authority limited to specific areas in the overall organization, project managers have authority over any activity required by the project.

False

Which of the following is not a category in the RACI matrix?

Interpret

The four essential skills of persuasion described Jay Conger 1998 include all of the following except.

Must give locker-room motivational speeches;

Which of the following is a nonnumeric project selection method?

Q sort method

Blue Sky projects are?

RD projects

The PMs job includes all of the following except?

Supervisor;

During project formation stage, the major sources of conflict are all of the following except.

Technical;

Which of the following is not a characteristic of a project?

They are routine

Which of the following is not a characteristic of effective project team members?

They have a strong orientation to their discipline;

One limitation of scoring methods is that they can only incorporate quantitative data.

false

A disadvantage of using the discounted cash flow method or net present value for selecting projects is that it ignores all non-monetary factors associated with the project.

True

A matrix organization is a combination of pure project organization and functional organization.

True

A representative of senior management should be invited to the project launch meeting

True

As the present value of future returns decreases with rising discount rates, firms with high hurdle rates favor short-run projects.

True

In order for a PM to be believable the PM must have technical and administrative credibility.

True

It is appropriate for the project manager to play an active role in communications between the client and the senior management of the organization conducting the project

True

It is common to have more than one boss in a matrix organization.

True

Matrix, pure project and functional project organizations may exist in the same company.

True

Morale of the project team is a key responsibility of the project manager.

True

Political savvy is not only an important characteristic of a project manager but is also important forproject team members

True

Predecessors must be listed in the WBS because they are critical for scheduling.

True

Projects are always carried out under conditions of uncertainty.

True

The action plan should identify the projects deliverable.

True

The individual with responsibility for performing a task is more likely to overestimate the time required to complete the task than his her immediate supervisor.

True

The letters used in the RACI matrix help link a person and a task for accountability purposes.

True

When it comes to assigning individuals to work on projects functional managers and project managers are often in conflict.

True

How many different types of project organizations are there?

Unlimited Number

Projectitis is most likely to occur in which type of project organizational structure?

a pure project organization;

In order to prepare a mind map you need to start with.

a statement of the projects objectives

A matrix project that closely resembles the pure project is referred to as?

a strong matrix

A Project charter affirms that all major parties of interest are in agreement on

all of the above

Interface mapping can be used during interface coordination and integration management to

all of the above

The project manager is responsible to.

all of the above

The skill of persuasion has the following parts

all of the above

Projects that begin with a slow start have quick momentum in the middle and have a slow finish are said to follow which type of lifecycle?

an S shaped lifecycle

The blank approach centers on understanding the bits and pieces in a system

analytical

In project management, superior-subordinate relationships are known and lines of authority are clear

false

In the Design Structure Matrix

both the rows and columns correspond to tasks;

Which of the following is an important project manager role?

communicator

Which of the following is not related to the three goals of a project?

data

A PM does not need to understand why a project is selected for funding because he did not initiate the process.

false

A disadvantage of empowerment is the lack of timely feedback.

false

A disadvantage of using scoring models rather than financial models for selecting projects is that they cannot include the projects profitability.

false

A key deficiency of the aggregate project plan is that it provides little information about the resources committed to the various projects.

false

A similarity between project management and general management is the tendency to manage by exception.

false

As a rule of thumb the lowest level tasks in a typical project should not take longer than two days to complete

false

As a rule of thumb the number of factors included in a scoring model should be at least 10

false

Conflict occurs mainly at the beginning of the project.

false

Functional project organizations have higher personnel costs than pure project organizations

false

If the performance of all subsystems is optimized it follows that the overall system is optimum

false

SDT stands for

self directed team

SMT standards for

self managed teams

The operation was a success but the patient died best exemplifies?

suboptimization;

Which of the following is not true concerning the difference between the project manager and the traditional manager

the PM uses an analytical approach the TM uses a systems approach

Which of the following is used to show linkages between people and tasks?

the RACI;

A matrix that illustrates the magnitude of both product and process changes resulting from a project is called

the aggregate project plan

Which of the following are projects?

the design and development of a new product;

The results of the launch meeting include.

the projects scope is understood;

What is the primary purpose of creating a work breakdown structure?

to make sure important tasks are identified;

The first task of a newly appointed project manager is

to review the project objectives with senior management

A disadvantage of using the payback period method for selecting projects is that it cannot reflect the time value of money.

true

A limitation of traditional project management planning tools is that they do not address the flow of information

true

A primary purpose of forming projects is to assign the responsibility for accomplishing some organizational task to a specific person or small group.

true

A pure project organization is usually too expensive for the management of small projects

true

Achieving both strategic and routine goals are growing in importance in project management

true

Another name for concurrent engineering is simultaneous engineering.

true

Functionally organized projects are not seen as a high priority by functional managers.

true

Having responsibility for the outcome of a project without the authority of rank or position is common in project management

true

In project management it is often necessary to trade off one objective for another.

true

Integration management and parallel tasking are fundamentally concerned with coordinating the flow of information.

true


Ensembles d'études connexes

[CS 2337] Chapter 12: Pointers, Classes, Virtual Functions, Abstract Classes, and Lists

View Set

Personal Finance Planning Quiz 1 Chapters 1-2

View Set

EXAM 3 ATI QUESTIONS EDOCRINE SYSTEM

View Set