CM 2116 Midterm
ANSI A paper measures 8.5 x _____ inches
11
ARCH A paper measures 9 x _____ inches.
12
The MasterFormatTM standard was originally created in 1963 by the Construction Specifications Institute (CSI) with _______ divisions.
16
ARCH D paper measures 24 x ____ inches.
36
The current MasterFormatTM specification format currently contains ________ divisions.
50
It is estimated that roughly ______ percent of all codes deal with fire and life safety issues.
75
The majority of architects and engineers use symbols adopted by the __________
AIA
The _______ of lines is the unique language of architects and engineers.
Alphabet
Preliminary drawings go through many _________
Alterations
AIA stands for the
American Institute of Architects
ANSI stands for the
American National Standards Institute
ASME stands for the Answer
American Society of Mechanical Engineers
Working drawings may use the page numbering system using the letter A for ________ pages.
Architectural
_________ dimensions measure a 2 dimensional area usually expressed as square feet or square meters.
Area
Presentation drawings are selling tools showing the project in its most _______ light.
Attractive
CAD stands for
Computer Aided Design
Drawing with all lines of the same intensity or thickness makes a plan _______ to read.
Difficult
A _______ is a numerical value expressed in appropriate units of measurement.
Dimension
Working drawings may use the page numbering system using the letter E for ________ pages.
Electrical
______ are views that show the interior (or exterior) sides of a building.
Elevations
Dimensions typically use metric or _______ units.
English
Working drawings are technical in nature intended to furnish information necessary to ________ a structure.
Erect
According to the YouTube video On Center Software - Inside the Blueprint Official on average one in five bids is is actually won by the company.
False
On-Screen Takeoff creates blueprints in different languages.
False
On-Screen Takeoff does not provide in-house training.
False
PlanGrid and On-Screen Takeoff are completely free to use forever.
False
PlanGrid lets you share content and mark ups with your team within 24 to 36 hours.
False
What will using On-Screen Takeoff not do?
Identify code violations
________ dimensions measure a 1 dimensional length between two points typically expressed as feet or meters.
Linear
________ are the basis of all construction drawings.
Lines
________ sizes are the rough sawn measurement of lumber while actual sizes are the finished sizes.
Nominal
_______ are a pivotal aspect of construction drawings as they often contain critical information regarding the project.
Notes
_______ specifications give the contractor some choice of material selection.
Open
__________ objects make distant objects appear smaller even though they have the same shape.
Perspective
Initial designs are presented in _________ drawings.
Preliminary
________ drawings are used for promotional purposes.
Presentation
Dashed or hidden lines can serve more than one ________ in a set of plans.
Purpose
_______ dimensions are used for measuring the radius of an arc or diameter of a circle.
Radial
_______ dimensions are for information purposes only and should not be used for manufacturing something.
Reference
Subcontractors and suppliers typically rely on __________ drawings.
Shop and Assembly
Working drawings may use the page numbering system using the letter S for ________ pages.
Structural
Because of ________ and cost constraints, few companies would endeavor to write a completely new set of specifications for each job.
Time
The six primary orthographic views are the front, _________ , right, left, bottom, and back views.
Top
On-Screen Takeoff can be used to put together an accurate project estimate.
True
On-Screen Takeoff is used to build takeoffs and calculations.
True
PlanGrid is best described as Construction Productivity Software.
True
PlanGrid securely plans up information to the cloud.
True
_________ dimensions measure a 3 dimensional volume usually expressed in cubic feet or cubic meters.
Volume
A ________ schedule is similar to a door schedule in that it provides an organized presentation of the pertinent window characteristics.
Window
_______ drawings are also called project and construction drawings.
Working
A plan drawing represents a view of the project from _______
above
The three scales typically used for construction plans are the ___________ scale, civil engineer's scale, and metric scale.
architect's
The most obvious difference between _______ and architectural drawings is the use of the engineer's scale.
civil
_______ specifications limit acceptable products to one or a few choices.
closed
Properly done, schedule help our drawings from becoming too ________.
cluttered
Doors may be identified as to size, type, and style with _________ numbers placed next to each door symbol in the floor plan view.
code
The MasterFormatTM standard is the most widely used for organizing specifications for ________ building projects
commercial
The ________ sheet is important because it lists the drawings that comprise a set of plans in the order they appear.
cover
Orthographic views do not show any _______ to an object.
depth
The benefits of CAD include lower product development costs, faster processing, and greatly shortened ________
design cycle
Many materials are represented by one symbol in a plan view and a _________ symbol in elevation views.
different
Panel-board schedules are usually found on ________ drawings.
electrical
Common orthographic drawings on construction drawings are plans, _________, and sections.
elevations
General architectural plans consist of plan views, _______, and sections.
elevations
A room ________ schedule specifies that material finishes for walls, floors, and ceilings of interior spaces.
finish
Drafting is an international ________ language.
graphic
The construction drawings contain as much information about a structure as can be presented _________.
graphically
One must differentiate between ________ piping and residential/commercial piping or plumbing.
industrial
Schedules are essentially tables that list _______ about specific items in the drawings.
information
ISO stands for the __________
international organization for standardization
Thin lines are not ________ important than thick ones.
less
Structural drawings provide the reader with a view of structural members and how they will support and transmit _______ to the ground.
loads
Door schedules typically indicate the model or ________ , quantity, size, thickness, type, material, function, frame material, fire rating, and remarks.
mark
For various reasons, some of the symbols on a drawing may not be standard, and you will have to figure out what a symbol ________ by analyzing it and thinking about what it looks like.
means
The are many types of HVAC schedules prepared by the ________ consultants.
mechanical
In practice, the _________ number of orthographic views necessary are provided on a set of plans.
minimum
Orthographic drawing is also known as ________ drawing.
multiview
In order for a system of symbols to work, each drawing within a set has its own unique _______
number
A building ________ will only be issued after the drawings are checked and approved by the various regulatory departments.
permit
The two important rules of orthographic drawing are view, _________ , and alignment.
placement
A _________ view is an orthographic view looking at an object from directly above.
plan
A site or plot plan is a drawing of a _________ that shows its size and configuration including the size and location of buildings and driveways.
property
Drawings alone cannot define the ________ issues of a project.
qualitative
Specifications prescribe ________ of construction expected on a project.
quality
One of the main functions of graphic symbols on construction drawings is to _______ other drawings within the set.
reference
A ________ as applied to construction working drawings is an organized method of presenting a list of materials.
schedule
Sometimes a symbol for a particular component may have been ________ created by the architect or engineer who developed the drawing.
specifically
Large firms may create their own _______ for creating plans
standards
Mechanical drawings should contain appropriate notes, legends, ________ , and abbreviations.
symbols
Modified _______ are usually used because they are easier to draw and interpret.
symbols
Some lines are made _________ to stand out from the other lines on the plans.
thick
The United States and Canada use __________ angle orthographic projection for plans.
third
Isometric drawings are used to show a ________ dimensional picture in one view.
three
Sections offer a view ________ a part of the structure not found in other drawings.
through
The amount that a measurement can vary from the plans is known as the _________
tolerance
Line _______ is a pattern of dashes, dots, or gaps used to make lines look different.
type
Graphic symbols are often used on building plans to show window ________.
types
Object lines are also known as _______ lines.
visible
Line ________ is the thickness or width of a line.
weight
Electrical symbols are commonly used to simplify the work of the drafters and the ________ reading the plans.
workers