Info 311 Chapter 10 quiz review
four weeks
UP disciplines are involved in each iteration, which is typically planned to span ____.
predictive approach to SDLC
> WATERFALL MODEL > Assumes the project can be PLANNED IN ADVANCE and that the information system can be developed ACCORDING TO PLAN > Requirements are WELL understood and/or low technical risk
30 day
A Scrum sprint is a firm ____ time box, with a specific goal or deliverable.
Maintain core models to verify past decisions
Which of the following is NOT an Agile Modeling principle?
not required coding standards
Which of the following is NOT an XP practice? simple design, anyone can change code, small releases, not required coding standards
Working software over comprehensive documentation
Which of the following is a basic value of agile software development?
Produce rough estimated of cost and schedule
Which of the following is competed in the inception phase of the UP?
Complete beta testing
Which of the following is completed in the transition phase of the UP?
ALL of them
Which of the following methodologies use an adaptive approach to systems development
three approaches to XP
1.) Outside Ring (system) 2.) Middle Ring (release) 3.) Inside Ring (iterations)
technique
A(n) "_______" is a guideline to help an analyst complete a specific task and often includes step-by-step instructions to do something such as how to create a model.
adaptive
A(n) _____ approach to the SDLC is used when the exact requirements of a system or needs of users are not well understood.
system development methodology
A(n) _____ provides guidelines to follow for completing every activity in systems development, including specific models, tools, and techniques.
modified waterfall
An approach to the SDLC where the phases overlap is often referred to as the _____ approach
system metaphor
In XP development, a(n) _____________ can guide members toward a VISION and help them UNDERSTAND the system?
are you meeting your scheduled deliverables?
NOT a question that is asked in a scrum meeting?
support phase
Objective of the ___ is to keep the system running productively during the years following its initial installation.
tools
SOFTWARE APPLICATIONS that ASSISTS DEVELOPERS in creating models or other components required for a project?
team
Scrum focuses primarily on the ___ level.
waterfall model
The ___ approach is an SDLC approach that assumes the output of each phase are frozen before moving on to the next phase
user stories
The first XP development activity is creating _____.
iteration
The term "____" means that work activities are done once, then again, and yet again.
abstraction
The term "_______" is used to separate out some aspect of the real world that is important to understand when we build a model.
phases, disciplines, iterations
UP life cycle model includes all of the following:
continuous integration
XP Practice > grow the software CONTINUOUSLY > Small pieces of code (which have passed unit tests) integrated rapidly
owning the code collectively
XP Practice: > egoless development, anyone can REVIEW and IMPROVE CODE
System metaphor
XP Practice: > what should the final system LOOK LIKE
the requirements are uncertain
an adaptive approach to a development project is best used when ____.
understand what you are building and communicate the solution
in agile modeling what are the TWO important reasons for building models?
product owner
in scrum, the ____ maintains the product backlog list.
developing software
primary goal in Agile Modeling?
SDLC
system development life cycle
planning a series of iterations
the FIRST release level activity in an XP development approach is _____?
configuration and change mgmt
the UP ____ discipline involves setting up the guidelines to manage releases and versions
user stories
the basis of an XP plan is a set of ____ that users develop.
training the users
which of the following is NOT one of the major activities of the support phase? maintaining the system, enhancing the system, supporting the users, training the users